• 75b Parallel Twin Screw Extruder
  • 75b Parallel Twin Screw Extruder
  • 75b Parallel Twin Screw Extruder
  • 75b Parallel Twin Screw Extruder
  • 75b Parallel Twin Screw Extruder
  • 75b Parallel Twin Screw Extruder

75b Parallel Twin Screw Extruder

Raw Material: Mixing
Screw: Double-Screw
Inverter: Inverter
Electromagnetic Heater: Electromagnetic Heater
Automation: Automatic
Computerized: Computerized
Customization:
Diamond Member Since 2022

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
75B
Customized
Customized
Condition
New
Origin
China
Production Capacity
100

Product Description

(1) ambient temperature (indoor) not less than 0 ºC,no higher than 40 ºC;
(2) not more than 85% relative humidity;
(3) no explosive, corrosive and other harmful media around, no serious dust and conductive dust;
(4) as sine wave AC power and three phase, amplitude changes of no more than ± 5%, short-term changes of no more than ± 10%;
 (5) more than 1000 meters above sea level, the motor rated power will be reduced.
75b Parallel Twin Screw Extruder75b Parallel Twin Screw Extruder75b Parallel Twin Screw Extruder75b Parallel Twin Screw Extruder
Overview
1,Unit for the machine factory, machine parts, including processing required screw, barrel and other host part, the transmission system, the materials feeding system (one way or multi way charging), lubrication system, temperature control system, the vacuum condensate system, granulating system, electrical or auto-instrumentation and alarm interlock system. The assembled machine has been initially run in the factory. Devices arrival at the user factory please match our deliver sheet. Any question, please contact us.
2,Host needs to be based on concrete foundation, basic dimensions and the auxiliary position, please follow our company drawing. Host installation must be carried out with a level meter on the surface of the host chassis, adjust the master level degrees to allow deviation of 0.1 mm / m, then the secondary grouting anchor bolts buried. SHJ-36 testing machine can be placed on the flat concrete floor without secondary grouting.

3,Electrical apparatus control cabinet is movable structure. the installation location can be shifted according to the user site layout provided the appropriate installation. The principle is adjacent to the host whici is beneficial to the host operation. If possible ,It's better to screen the dust from dust which reduces failure.
4,
When all the main and auxiliary units are in place, then goes water pipeline.The unit external hard-piping include: cylinder cooling system and oil system cooler with cooling water in-and-out pipe. Reguarding part of the auxiliary equipment can be mobile, the external part of the soft piping unit including: water ring vacuum pump and pipe, trough and cooling water pipe,and dice the cooling water into the drain cover. The connection pipes is on the user side according to information provided by my company to install.if tany difficulty, we can provide installation guidance service. cleanand remove masonry debris, impurities before use of pipes.

5,The general power requires three-phase four-wire 380V, distribution capacity, subject to electrical control instructions, wiring on the user side. And requested the bus in the next unit before the placement of a suitable switch with over-current protection to prevent failures caused by outside electric meter component damage.

6,Any wiring related to the unit of electrical, instrumentation, control and auxiliary equipment, please follow the provided the drawing, but subject to the company commissioning staff on-site verification. If problem, contact us. All electrical equipment should be reliable and well-grounded.
7,For water-cooling cutting strand granulator, roller compaction granulator is pneumatic control,should be equipped with 0.8Mpa gas source by your side, or 500W small air pump. Please self-prepare feeding machine part of the pre-mixing and granulation of material storage and finished product storage and transportation and post-measures. ( can be also provided by our side).
8,If you do not provide any drawing to us, please refer to our information to install. If contact  our company, I believe that is more conducive to equipment layout.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2022

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company
Management System Certification
ISO 9001, ISO 9000, ISO 14001, ISO 14000
Export Year
2000-06-30